Land: |
Palästinensische Gebiete
|
Abgabetermin: |
19.04.2023
|
Finanzierung: |
Weltbankgruppe (IBRD)
|
EMA Referenznummer: |
2023-04-03_3
|
Betreff: |
Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector in the; UPDATE- Assessment of Sustainable Lead Acid Battery (ULAB) Disposal, Collection and Recycling Scheme, Gaza Strip –Palestine
|
This content has been restricted to logged-in users only. Please login to view this content.