Land: |
Palästinensische Gebiete
|
Abgabetermin: |
05.04.2023
|
Finanzierung: |
Weltbankgruppe (IBRD)
|
EMA Referenznummer: |
2023-02-24_4
|
Betreff: |
Phase 2 Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector; Supply of Medium Voltage Cables, Low Voltage Cables, Wires, Steel Materials and Accessories in Gaza Strip
|
This content has been restricted to logged-in users only. Please login to view this content.